Doha North Lagoon 2 Project

Client:
Ashghal
Location:
Doha, Qatar
Period:
from 08.2009 to 05.2011
Project Detail

Construction of Lagoon 2 Project at the Doha North Sewerage Treatment Plant .
Scope of work includes:

  • 4.5 km of 7 m High Concrete Retaining Walll.
  • Grouting Works underneath the Wall for Wtater Seapage.
  • 300,000 m³ Backfill Material on the Wall Including Geotextile
  • 4.5 Km Road Works.
  • 6,000 Drainage Pipes with Gravel Surround.
  • 600 m of RCCP Pipes and Manholes.
  • Overflow Structure & Inlets.
  • Piezometric Walls