Doha North Lagoon 2 Project
Client:
Ashghal
Location:
Doha, Qatar
Period:
from 08.2009 to
05.2011 Project Detail
Construction of Lagoon 2 Project at the Doha North Sewerage Treatment Plant .
Scope of work includes:
- 4.5 km of 7 m High Concrete Retaining Walll.
- Grouting Works underneath the Wall for Wtater Seapage.
- 300,000 m³ Backfill Material on the Wall Including Geotextile
- 4.5 Km Road Works.
- 6,000 Drainage Pipes with Gravel Surround.
- 600 m of RCCP Pipes and Manholes.
- Overflow Structure & Inlets.
- Piezometric Walls