Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/e/4/4/buildersqatar.com/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2858 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/e/4/4/buildersqatar.com/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2862 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/e/4/4/buildersqatar.com/httpd.www/wp-content/plugins/revslider/includes/output.class.php on line 3708 Warning: Cannot modify header information - headers already sent by (output started at /customers/e/4/4/buildersqatar.com/httpd.www/wp-content/plugins/revslider/includes/operations.class.php:2858) in /customers/e/4/4/buildersqatar.com/httpd.www/wp-content/plugins/onecom-vcache/vcaching.php on line 716 Doha Solid Waste Management Project

Doha Solid Waste Management Project

Client:
Ministry of Municipality and Urban Planning
Consultant:
SMEC
Location:
Doha, Qatar
Period:
from 01.2008 to 06.2010
Project Detail
  • Potable and Fire water network (20 Km)
  • Irrigation System (10 Km)
  • Wastewater Collection system (12 km)
  • 11 Kv power cable network
  • Communication duct banks
  • Power duct banks
  • Street Lighting
  • Earthing system
  • Sewer lifting stations
  • Supply & Installation of Street Lights and High Mast.