Modifications To The Existing Industrial Wastewater Treatment Plant No. 8, Pump Stations 15 And 16

Client:
Royal Commission for Jubail & Yanbu
Consultant:
Saudi Arabian Bechtel Co. (SABCO)
Location:
Jubail, Saudi Arabia
Period:
from 04.1999 to 07.2000
Project Detail

The work to be performed under this Procure and Construct (PC) Contract consists of furnishing all plant, material, labor, supervision, tools equipment and technical professional services including shop drawings for the modifications of the Existing Industrial Wastewater Treatment Plant No. 8 and Pump Stations 15 & 16. The project is divided into two stages:

ITWP-8 Stage I
Work includes removal of old lagoon liners and installation of new liners, aerators including submersible cables, sluice gate actuators and monitoring devices, installation of an effective oil removal system in Lagoon No. 1 , replacement of existing pumps to a larger capacity in Emergency Pump Station No. 1 including associated pipework, modification of electrical cabling, provision of a new MCC including a pump sequencer in the existing instrument panel and testing and commissioning of Stage I works of ITWP-8

ITWP-8 Stage II
Work includes installation of 4 nos. new dual media pressure filters, feed pumps and piping controls and instrumentation, replacement of existing chlorination system, installation of a new MCC, instrument panel, chlorine gas detectors, fire alarm system and testing and commissioning of Stage II works of ITWP-8.

Pump Stations 15 & 16
Complete replacement of existing pumps and motors with larger capacity, modification of pipework, concrete work, valves and flow meter, modification of electrical works and control system including replacement of motor starters for Pump Station 16 and extension of existing MCC for Pump Station 15 and testing and commissioning of works.