Qatar Race Track

Client:
Qatar Racing Club
Location:
Industrial Area
Period:
from 10.2014 to 02.2015
Project Detail
  • Construction of ground slab
  • Supply & installation of Pre-engineered steel structure inside the existing warehouse
  • Construction of mezzanine floor area
  • Construction of plinth for utilities equipment (generator, chiller, water tank, compressor)
  • Supply & installation of block works
  • Supply & installation of finishing works
  • Supply & installation of mechanical works (HVAC, compress air system, plumbing & drainage)
  • Supply & installation of electrical works (MV panel, distribution boards, lighting, cables, small power & devices