Qatar Race Track
Client:
Qatar Racing Club
Location:
Industrial Area
Period:
from 10.2014 to
02.2015 Project Detail
- Construction of ground slab
- Supply & installation of Pre-engineered steel structure inside the existing warehouse
- Construction of mezzanine floor area
- Construction of plinth for utilities equipment (generator, chiller, water tank, compressor)
- Supply & installation of block works
- Supply & installation of finishing works
- Supply & installation of mechanical works (HVAC, compress air system, plumbing & drainage)
- Supply & installation of electrical works (MV panel, distribution boards, lighting, cables, small power & devices