Refurbishment Works for Building 108 at Doha Airbase

Client:
QDVC
Location:
Doha, Qatar
Status:
Completed
Period:
from 01.2020 to 09.2020
Project Detail

The Scope of Works Consists of:

  1. Stripping & Removal of All Existing Tiles (floor & wall) of the Toilet
  2. Removal of Existing Ceiling Tiles at Toilets
  3. Demolition of Partition Walls at Toilets
  4. Supply and Installation of Blocks for Partition at Toilets
  5. Supply and Application of Waterproofing
  6. Installation at Floor & Wall Tiles at Toilets
  7. Repair and Maintenance of Doors
  8. Supply and Installation of Vanity Counter & Mirror
  9. Removal of Existing Drainage and Water Supply System
  10. Supply and Installation of New Drainage and Water Supply System
  11. Removal of Existing Sanitary Fixture and Supply & Installation of New Sanitary Fixtures
  12. Removal of Existing Roof Exhaust Fans and Supply & Installation of New Roof Exhaust Fans
  13. Supply and Application of Paint System
  14. Removal of Existing Lighting Fixture & Fittings and Supply & Installation of New Lighting Fixtures & Fittings.
  15. Removal of Existing False Ceiling and Supply & Installation of New False Ceiling at Commander Office
  16. Removal of Existing Lighting Fixture & Fittings and Supply & Installation of New Lighting Fixture & Fittings