New Doha International Airport – Utility Systems (Cp13)

Client:
NDIA Steering Committee
Location:
Doha, Qatar
Period:
from 02.2006 to 12.2009
Project Detail

Engineering, Procurement and Construction (EPC) of the Utility Systems for the New Doha International Airport.

  • Central Utility Plant to include standby diesel generators (40MW – 8 no.) chiller plant (12,000 TR – 6 no.) electrical switchgear & transformers.
  • Waste Water Treatment Plant (27,000 m3/day)
  • Power Substations (5 no. – 66kv & 11kv)
  •  Large Pre-stressed Concrete Water Tanks (total: 21 nos.) consisting of: 11 Nos. for Potable, Fire and Irrigation Water, of different sizes (e.g. 45m diameter x 10m high) with total capacity of 71,800m3; 10 Nos. for Waste Water Treatment of different sizes (e.g. 51m diameter x 15m high) with total capacity of 85,000 m3.
  • Potable & Fire Water Network (57 km.)
  • Irrigation System (26 km)
  • Waste Water Collection System (28 km)
  • Chilled Water Piping System (3.6 km)
  • 66kv Power Cables Network
  • 11kv Power Cables Network
  • Communication Duct Banks
  • Power Duct Banks
  • Auxiliary Transformers and Package Substations